Duqm Power Company SPC (DPC), a 100% owned subsidiary of Marafiq, was established to execute and supply two major key developments in Duqm with utility requirements via the Duqm Integrated Power and Water Plant (DIPWP) project and 132 KV Power Transmission System to Raz Markaz (132 KV RMT) project.
DIPWP project Provides power and water to Duqm Refinery (OQ8), on captive basis. Utilizing state of the art technology, the project facilities includes: 325 MW Combined Cycle Gas Turbine (CCGT) Power Plant, 36,000 m3/day (equivalent to 800 large water tankers), Sea Water Reverse Osmosis (SWRO) Desalination Plant, 1,500,000 m3/day (equivalent to 33,000 large water tankers), Seawater Intake Facilities and 1,000,000 m3/day (equivalent to 22,000 large water tankers) Outfall Facilities. The Seawater Intake and Outfall Facilities have sufficient capacity to serve future investors in the Duqm Industrial Zone with their water requirements.
DIPWP & 132 KV RMT Projects Scheme